AI grounded project costingthe craftsheart platform, v1

Describe the project.
Get an estimate grounded in what similar work actually cost you before - not a generic template.

Craftsheart connects to your company's past quotations, invoices, and cost records, then produces accurate cost estimates and ready-to-send quotations for new projects - with every figure explainable, not guessed.

Grounded, not templated Every line item explainable Wins and losses feed the next quote
estimate-builder / live
idle
01 New project
new project
Office fit-out, 3,000 sq ft, mid-range finish - HVAC and partitions in scope, furniture excluded.
briefno template
02 Similar past projects
Office fit-out
2,800 sq ft - mid-range finish
₹ 42,10,000 final cost
Office fit-out
3,200 sq ft - mid-range finish
₹ 48,60,000 final cost
03 Cost breakdown
  • Materials₹0
  • Labour₹0
  • Overhead₹0
  • Margin18%₹0
Total₹48,25,200
Quotation ready
The costing problem

The estimate step is where margin quietly leaks - three ways at a time.

The tools most companies rely on to price new work weren't built for costing at all. They're spreadsheets, email threads, and the memory of whichever estimator happens to be on the project. The result is quotes that read confidently and estimate roughly.

01

Estimated from memory, not from history.

A new quote gets built up from what someone remembers a similar job costing - not from what similar jobs actually finished at.

02

Material and labour prices go stale.

Rates sit in a spreadsheet that gets refreshed twice a year. Meanwhile costs move quarter to quarter, and the quote absorbs the gap.

03

Nobody can tell which quotes actually win.

Wins and losses are logged somewhere, but never fed back into pricing. So the strategy never really improves, only the confidence.

How Craftsheart works

Four stages. One grounded number at the end of them.

No template libraries to maintain, no manual rate cards to update every quarter. The engine plugs into where your cost history already lives, then works forwards from there.

stage 01

Connect

Link past quotations, invoices, and cost records. No manual rate cards, no CSV wrangling.

Drive folderlinked
SharePoint /financelinked
ERP export - quarterlyscheduled
stage 02

Estimate

A new project's cost generated from genuinely similar past work, not template arithmetic.

Materials ₹ 22,40,000
Labour ₹ 14,60,000
Overhead ₹ 3,80,000
stage 03

Quote

The estimate becomes a polished, branded quotation - automatically. Not a Word template.

quotation - draft
ready to send
stage 04

Learn

Win rates and margins tracked over time, sharpening every next quote - not a stale dashboard.

win rate by quarter
What the AI actually does

Concrete capabilities, not spreadsheet arithmetic.

Four things, done well. Each one shows up in the product as a visible behaviour you can point at, not a claim on a comparison table.

grounding

Historical grounding

The engine pulls the past projects most genuinely similar to a new brief - by scope, size, materials, and finish - and uses them to inform the estimate.

Office fit-out - 2,800 sq ft92% similar
Office fit-out - 3,200 sq ft89% similar
Retail - 2,400 sq ft64% similar
How grounding works
analysis

Cost-driver analysis

Line items are flagged when they sit meaningfully above or below the comparable past projects - with the comparison visible on the same screen.

Materials+ 11%
Labouron track
Overheadon track
How driver analysis works
quotation

Automated quotation generation

Turn a cost estimate directly into a client-ready document. Your branding, your terms, your finish - filled with the estimate the engine just built.

Cover pageready
Scope + assumptionsready
Payment termsready
How quotation generation works
feedback

Margin & win-rate intelligence

Track which pricing levels actually convert - by project type, size, and client segment - informing what the engine suggests for the next similar quote.

Fit-outs - 14% marginwins 62%
Fit-outs - 18% marginwins 47%
Fit-outs - 22% marginwins 21%
How win-rate intelligence works
Built for two kinds of project-based work

Same engine. Two very different pricing problems.

Construction teams need defensibility - a number a client won't push back on. Agencies need consistency - a proposal that doesn't get reinvented from scratch every Monday.

Construction & engineering

Defensible estimates for genuinely variable scope.

Every line item traceable to a comparable past project. When a client asks why materials sit 8% above last quarter, the answer is one click away, not one meeting.

  • Cost history pulled from your own invoices, not a benchmark database
  • Line-item comparison against similar past scopes
  • Margin bands that hold up under client scrutiny
For construction & engineering
Agencies & service businesses

Consistent pricing across every proposal, not reinvented each time.

Retainer or fixed-scope, a Craftsheart proposal reads like your best proposal - because it's grounded in the shape of your best proposal, not the one you happened to open on your desktop.

  • Grounded scope + effort estimates from your delivered work
  • Retainer sizing informed by realised utilisation
  • Win-rate tracking by proposal type and price band
For agencies & service businesses
The three metrics that move

Grounded estimates. Explainable drivers. Sharper pricing.

Grounded
estimates

Pulled from your own past projects, not a template gallery.

Explainable
cost drivers

Every line traceable to a comparable past line, not a guessed final number.

Tracked
win rates

Wins and losses inform every next quote, sharpening pricing over time.

try it on your own brief

Describe a project.
Watch the estimate build.

Type a project brief. Or pick one below. Craftsheart will assemble a sample estimate - references, breakdown, and quotation seal - on whatever you write. Demonstration only, no data leaves this page.

or try
estimate-builder / live
idle
01 New project
CONSTRUCTION
Office fit-out, 3,000 sq ft, mid-range finish
briefno template
02 Similar past projects
Office fit-out
2,565 sq ft - mid-range finish
₹ 38,30,000 final cost
Retail interior
3,174 sq ft - mid-range finish
₹ 41,10,000 final cost
03 Cost breakdown
  • Materials₹0
  • Labour₹0
  • Overhead₹0
  • Margin16 to 18%₹0
Total₹41,70,000
Quotation ready
Demonstration only. In your account, references are pulled from your own past project files - not a preset table.
next, on your real projects
Point the engine at your invoices and past quotes. Get estimates grounded in your history.